Dukoria International Limited works with a number of companies including; Chevron Nigeria Limited, Shell Petroleum Development Company(SPDC), Neconde Energy Ltd, Sterling Oil, SEPLAT Petroleum Development Company, Pan Ocean Oil Corporation, Platform Petroleum, Saipem Contracting, Daewoo Nigeria Limited, Desicon Engineering Ltd, Saidel Ltd and a lot more with verified track record of prowess and success.
We work collaboratively with your team to get your project approved, permit issued by regulators and in commission on budget and in a timely manner, excellently planning in order to circumvent rework and delays.
Some Selected Projects
S/N | JOB TYPE | CLIENT | CONTRACT NAME | ||
1 | EIA | SYNERGENT | EIA OF 50 MW SOLAR FARM AT KADO VILLAGE, KADUNA STATE | ||
2 | EIA | CHEVRON COOPERATIVE SOCIETY, DELTA AREA | EIA of REAL ESTATE DEVELOPMENT AT EFFURUN, DELTA STATE | ||
3 | LABORATORY ANALYSIS | KENSPEROUS INT’L LTD-SPDC | ECM OF OTUMARA, SAGHARA & ESCRAVOS FLOW STATION SPDC SWAMP 1 | ||
4 | EMP | MAKON ENGINEERING SERVICES LTD/SPDC | EMP MONITORING OF SPDC NAG (DOMGAS) PROJECT AT AGBADA FLOW STATION, RIVERS STATE | ||
5 | EIA | SCHUTMANN NIGERIA LIMITED/NIGERIA GAS COMPANY | EIA FOR GAS SUPPLY PIPELINE ROUTE FROM PK 275.35 TO OMO-WOOD INDUSTRY, OGBERE, OGUN STATE | ||
6 | ANALYSIS | PAN OCEAN OIL CORPORATION | ANALYSIS OF DRILL CUTTINGS AND MUD FOR EVERY 1000FT DRILLED AT OF OBI ANYIMMA DRILLING LOCATION | ||
7 | LABORATORY ANALYSIS | AMBAH PROJECTS LIMITED /SPDC | EIA OF ASA NORTH, SPDC LOCATION | ||
8 | STUDIES/LAB ANALYSIS | BRITTANIA-U LIMITED | EER BASED EIA OF AJAPA DRILLING CAMPAIGN, OML 90 OFFSHORE/SEABED SURVEY | ||
9 | MONITORING | PAN OCEAN LIMITED | ENVIRONMENTAL COMPLIANCE MONITORING OF DRILLED WELLS AT OPL 275, DELTA STATE. | ||
10 | MONITORING | SAIPEM CONTRACTING NIGERIA/SPDC | EMP COMPLIANCE MONITORING OF SOUTHERN SWAMP ASSOCIATED GAS SOLUTIONS (SSAGS), DELTA & BAYELSA STATE | ||
11 | MONITORING | DAEWOO NIGERIA LIMITED/SPDC | EMP COMPLIANCE MONITORING OF SOTHERN SWAMP GAS GATHERING PIPELINE PROJECT (SSGGPP), DELTA & BAYELSA STATE | ||
12 | MONITORING | SPDC | EMP COMPLIANCE MONITORING OF FORCADOS-YOKRI INTERGRATED PROJECT (FYIP) | ||
13 | INSPECTION/MONITORING | SEPLAT | ANALYSIS OF SOIL & WATER SAMPLE AT AMUKPE-RAPELE 24” PIPELINE AT ORERE-OLUBA OIL SPILL SITE | ||
14 | PIAR/EIA | STERLING OIL | PIAR & EIA OF OPL 2005 OF 3D SEISMIC STUDIES & EXPLORATORY/APPRAISAL WELL DRILLING) | ||
15 | PIAR/EIA | STERLING OIL | PIAR & EIA OF OPL 2006 2005 OF 3D SEISMIC STUDIES & EXPLORATORY/APPRAISAL WELL DRILLING) | ||
16 | EIA | NIGERIA GAS COMPANY LTD (NGC) | EIA STUDIES FOR GAS SUPPLY PIPELINE ROUTE FROM SAPELE METERING STATION TO LIFE FLOUR MILL LTD | ||
17 | MONITORING | CHEVRON NIGERIA LIMITED | EMP COMPLIANCE MONITORING OF CNL OFFSHORE FIELDS | ||
18 | BIOMONITORING | CHEVRON NIGERIA LIMITED | BIO-MONITORING OF CNL OFFSHORE FIELDS(ACUTE TOXICITY & BIO-ACCUMULATION STUDIES) | ||
29 | PIAR | CHEVRON NIGERIA LIMITED | PRELIMINARY IMPACT ASSESSMENT REPORT (PIAR)OF MEREN/OKAN SEISMIC ACQUISITION PROJECT | ||
20 | EES | CHEVRON NIGERIA LIMITED | ENVIRONMENTAL EVALUATION STUDIES OF CNL FSO | ||
21 | MONITORING | DAEWOO NIGERIA LIMITED (DAWOO-56) | EMP COMPLIANCE MONITORING OF GBARAN INFILL FACILITY PROJECT – PACKAGE 2 | ||
22 | MONITORING | MORPOL ENGINEERING SERVICES | EMP COMPLIANCE MONITORING OF GBARAN INFILL PIPELINE PROJECT – PACKAGE 2 | ||
23 | SEABED SURVEY | OPTIMUM PETROLEUM/AFREN | ECOLOGICAL SEABED SURVEY (ESS) OF OPL 310 | ||
24 | SEABED SURVEY | OPTIMUM PETROLEUM/AFREN | POST-DRILL SEABED SURVEY (PDSS) OF OGO 1 WELL IN OPL 310 BLOCK | ||
25 | EIA | SEPLAT | ENVIRONMENTAL IMPACT ASSESSMENT OF FURTHER WELL DRILLING DEVELOPMENT AT OROGHO FIELD IN OML 38, DELTA STATE | ||
26 | EES | SEPLAT | ENVIRONMENTAL EVALUATION STUDIES OF OROGHO FIELD IN OML 38, DELTA STATE | ||
27 | MONITORING | DESICON ENGINEERING LTD | EMP COMPLIANCE MONITORNG FOR ODDI PROJECT, DELTA STATE | ||
28 | MONITORING | SAIDEL LIMITED | EMP COMPLIANCE MONITORING OF SOUTHERN SWAMP GAS EXPORT PIPELINE PROJECT (SSGEP), TUNU DELTA & BAYELSA STATE. | ||
29 | MONTORING | ALCON NIGERIA LIMITED | EMP COMPLIANCE MONITORING OF INSTALLATION OF GAS HANDLING FACILITY AT AFAM EASTERN GAS PROJECT, RIVERS STATE. | ||
30 | MONITORING | ALCON NIGERIA LIMITED | FABRICATION AND INSTALLATION OF END FACILITIES AT SOKU GAS PLANT, RIVERS STATE. | ||
31 | ESIA | NECONDE ENERGY LIMITED/NPDC | ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT OF FSO LOCATION IN OML 109, DELTA STATE | ||
32 | GEOPHYSICAL/METOCEAN SURVEY | NECONDE ENERGY LIMITED/NPDC | GEOPHYSICAL/METOCEAN SURVEY OF NECONDE FSO SITING, ESCRAVOS OFFHORE IN OML 109, DELTA STATE | ||